Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsMechanized Bridge

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers
Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers

Large Image :  Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers

Product Details:
Place of Origin: China
Brand Name: Harzone
Payment & Shipping Terms:
Minimum Order Quantity: negotiation
Packaging Details: According to detailed order
Delivery Time: negotiation
Payment Terms: According to detailed order
Detailed Product Description
Feature: Fast Erection Capacity: Heavy Loading Capacity
Structure: Simple Structure Status: Sefl Fold And Unfold
Product Name: Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers Color: Clients' Requirments
Warranty: 1 Year
High Light:

10min Mechanized Bridge

,

Medium Rivers Mechanized Bridge

,

Small Rivers Mechanized Bridge

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers
                    
Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers is sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle.

 

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers is mainly used to erect a bridge with a length of 21m long and a width of 3.3m to ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to go across small medium rivers and dry gaps rapidly.  

                          
 Pictures of Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers 0

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers 1

 

FAQ

1,How about quality control of your company?

Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.

 

2,Are you a factory or a trade company?

We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.

 

3,Where is your loading port?

Shanghai Port,Nanjing Port,Tianjin Port.

                    

Specifications of Less Operators: 2-3 Wheeled Load-13t Mechanized Bridge

Tracked load / axle load

60t / 13t

Outline dimension (L*W*H)

13*3.3*3.6m

Bridge length 21m
Negotiating length (on hard banks) 19m

Gross weight

32.5t

Bridge weight

10.5t

Section length

10.63m

Bridge width (when expanding)

3.3m

Track width

1.15m

Section height

0.95m

End section height

0.35m

Operator

2-3

Erection time

10 min

Max. longitudinal slope / lateral slope

±10%  / ±5%

Allowable bank height difference

5%

 

 

 

 

 

 

 

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)