Product Details:
Payment & Shipping Terms:
|
Product Name: | Ferry Barge | Horsepower: | 1.5hp |
---|---|---|---|
Type: | Seahawk 4 Boat Set | Passenger Capacity: | Four Adults |
Loading Capacity (kg): | 400kg | Size Ater Inflation (cm): | 351×145×48 |
High Light: | bay island barge,river heads barge |
Quick details
This 4-Person Capacity Boat is perfect for a day on the lake,
whether you are fishing, camping, or just cruising!
Lightweight and compact, this inflatable boat is a snap to assemble and can be ready for water in no time.
This summer take the fun of boating wherever you go!
Data information:
Name |
Package number |
Package weight (kg) |
Size ater inflation (cm) |
Material thickness (mm) |
Passenger capacity |
Loading capacity (kg) |
Horse power (hp) |
Accessory |
Seahawk 4 Boat Set |
1 |
21.5 |
351×145×48 |
0.75 |
Four adults |
400 |
1.5 |
Aluminium alloy oars and one high speed manual pump |
Introduction
Bailey Bridge is a standard bridge equipment, adopted extensively and the most popular in the world
Advantage
Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity
Features
1. High strength and big stiffness , relative to the concrete bridge can be reduced trabecular high and self-respect
2. Due to the steel isotropic, quality of a material is uniform and modulus of elasticity, that make steel bridge in the working condition and calculation compared with the assumption
3. Steel bridge generally USES factory, site splicing, the construction period is short, processing convenient and not affected by seasonal effect.
4. Steel bridge is suitable for industrialized manufacture and very convenient to transport.
5. Steel bridge is easy to repair and replace,long lifetime,material can be recycled.
Application
Beam bridge,arch bridge,rigid frame bridge,cable-stayed bridge,suspension bridge. passenger foot-bridge
Mixture form to erect all kinds of
Temporary Bridges, Emergency Bridges and Fixed Bridges.
Using the bridge equipment, the suspension bridges of varied span can be erected.
The bridge has the advantages of few components, light weight and low cost.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements
are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel
bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.
Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree.
Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884