Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsBailey Bridge

CB200 Panel Bridge Temporary Steel Bridge

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

CB200 Panel Bridge Temporary Steel Bridge

CB200 Panel Bridge Temporary Steel Bridge
CB200 Panel Bridge Temporary Steel Bridge

Large Image :  CB200 Panel Bridge Temporary Steel Bridge

Product Details:
Place of Origin: Hubei,China
Brand Name: China Harzone
Certification: ISO9001:2015
Payment & Shipping Terms:
Minimum Order Quantity: 1set
Price: Negotiated
Supply Ability: 50000 Ton/Tons per Year
Detailed Product Description
Standard: AiSi, ASTM, BS, GB Grade: Q345B-Q460C
Place Of Origin: Hubei,China Brand Name: China Harzone
Type: Temporary Bridge Application: Steel Structure Bridge
Processing Service: Bending, Welding, Decoiling, Cutting, Punching Certificate: ISO9001:2015
Color: According To Requirement Structure Type: Steel Truss Bridge
Installation: Engineers Guidance Supply Ability: 40000 Ton/Tons Per Year
High Light:

CB200 Panel Bridge

,

CB200 Temporary Steel Bridge

,

Bailey Temporary Steel Bridge

CB100 Designed Span Temporary Steel Bridge Bailey Truss Bridge


CB200 Panel Bridge Temporary Steel Bridge​ Description:

CB200 Panel Bridge Temporary Steel Bridge is portable steel bridge ,It has been widely used in various fields, its most important feature is to achieve a variety of spans, bear carrying capacity, light and handy components, easy to dismantle and strong adaptability can be quickly completed with simple tools and manpower.

 

The basic component of CB200 panel bridge consists of girder, deck, frame connecting structure, bridge end structure and gateway structure. The girder is composed of panel, panel pin (include safety circlip) and chord reinforcement. The deck is composed of transom, bridge plate and kerb. The frame structure is composed of raker, bracing frame, vertical frame, sway brace and vertical component. The bridge end section is composed of end post, lower bearing and frame plate. The gateway structure is composed of ramp, ramp bearing and end plate.


CB200 Panel Bridge Temporary Steel Bridge surface protection can be paint or hot-dip galvanized.

 

CB200 Panel Bridge Temporary Steel Bridge adopts modular design, featuring a large span,short construction period,fast erection, multiple reuses of bridge components. It has excellent interchangeability and connection ferformance. The bridge structure can be designed according to the bridge span and load requirement,which can quickly construct a temporay or semi-permanent bridge.

 

CB200 Panel Bridge Temporary Steel Bridge​ Specifications:

Type  CB100
Designed Span 6-60m
Designed Load HS25-44,Axle Load 20t,tracked load 50t
Panel Dimension 1.448*3.048m
Carriageway Width 4.2m/7.35m
Deck type steel deck/ wood deck

 

CB200 Panel Bridge Temporary Steel Bridge​ Advantage:


Possessing the features of simple structure,
great stability and long fatigue life
being capable of an alternative span, loading capacity
easy disassembling,
heavy loading capacity,
 

CB200 Panel Bridge Temporary Steel Bridge 0

 

CB200 Panel Bridge Temporary Steel Bridge 1CB200 Panel Bridge Temporary Steel Bridge 2

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)