Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsBailey Bridge

Cb 200 Bailey Metal Truss Bridge Compact Panel Bridge

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

Cb 200 Bailey Metal Truss Bridge Compact Panel Bridge

Cb 200 Bailey Metal Truss Bridge Compact Panel Bridge
Cb 200 Bailey Metal Truss Bridge Compact Panel Bridge

Large Image :  Cb 200 Bailey Metal Truss Bridge Compact Panel Bridge

Product Details:
Place of Origin: Hubei,China
Brand Name: China Harzone
Certification: ISO9001:2015
Payment & Shipping Terms:
Minimum Order Quantity: 1set
Price: Negotiated
Supply Ability: 50000 Ton/Tons per Year
Detailed Product Description
Name: Modular Bailey Bridge Brand Name: Harzone
Application: Emergency Bridges Type: Metal Truss Bridge
Certificate: ISO9001 Color: Any Color You Want
Structure Type: Steel Truss Bridge Installation: Engineers Guidance
High Light:

compact panel metal truss bridge

,

bailey metal truss bridge

,

bailey prefabricated steel truss bridge

CB 200 Metal Truss Bridge Compact Panel Bridge

CB 200 Metal Truss Bridge Compact Panel Bridge Description:

 

  • replacing collapsed bridges (between 3-metres and 200-metres long)

  • restoring access to roads washed out in storms

  • providing cost-effective temporary structures for roading projects

 

CB 200 Metal Truss Bridge Compact Panel Bridge Specifications:

 

Type  CB100
Designed Span 6-60m
Designed Load HS25-44,Axle Load 20t,tracked load 50t
Panel Dimension 1.448*3.048m
Carriageway Width 4.2m/7.35m
Deck type steel deck/ wood deck

 

The simple component of CB 200 Metal Truss Bridge Compact Panel Bridge contains of girder, deck, frame connecting structure, bridge end structure and gateway structure. CB 200 Metal Truss Bridge Compact Panel Bridge girder is combined of panel, panel pin (include safety circlip) and chord reinforcement. CB 200 Metal Truss Bridge Compact Panel Bridge deck is combined of transom, CB 200 Metal Truss Bridge Compact Panel Bridge plate and kerb. CB 200 Metal Truss Bridge Compact Panel Bridge frame structure is combined of raker, bracing frame, vertical frame, sway brace and vertical component. CB 200 Metal Truss Bridge Compact Panel Bridge end section is combined of end post, lower bearing and frame plate. The gateway structure is combined of ramp, ramp bearing and end plate.

 

Cb 200 Bailey Metal Truss Bridge Compact Panel Bridge 0

 

Cb 200 Bailey Metal Truss Bridge Compact Panel Bridge 1Cb 200 Bailey Metal Truss Bridge Compact Panel Bridge 2

The company's emergency transport engineering equipment plays an important role in the disaster relief in Songhua River and Zhouqu, Gansu Province.

At 12:30 noon on August 5,2010, a military engineering regiment of the Shenyang Military Region successfully erected a 183-meter emergency floating bridge made by Huazhou heavy industry in the UND river section of the Songhua River Jilin City River as the last shore boat docked with the river bank, through the flood-interrupted Jilin to Yongji, rock, Huadian Direction of the life of the passage, a large number of relief supplies smoothly through the pontoon, rushed to the disaster area.

The bridge is Jilin City's only route to the hard-hit cities of Yongji, Iwaki and Huadian. On July 28, the great flood destroyed this life passage, once causing traffic paralysis in Guillon, causing great difficulties for rescue and relief work as well as the travel of citizens. On the morning of August 4, when Premier Wen Jiabao was inspecting flood control and flood control work in Jilin City, he made a special trip to Wende Bridge to check on the disaster situation and ordered that this major artery of traffic should be blocked as soon as possible to restore normal traffic order. After more than 3 hours of tenacious struggle, 183 meters pontoon successfully completed. The Pontoon is a two-way two-lane bridge with a maximum carrying capacity of 50 tons of vehicles, which can reach the road transport capacity of the windward bridge before it crashes.

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)