Product Details:
Payment & Shipping Terms:
|
Name: | Modular Bailey Bridge | Brand Name: | Harzone |
---|---|---|---|
Application: | Emergency Bridges | Type: | Metal Truss Bridge |
Certificate: | ISO9001 | Color: | Any Color You Want |
Structure Type: | Steel Truss Bridge | Installation: | Engineers Guidance |
High Light: | replacing collapsed bailey bridge,3 metres long bailey bridge |
Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge Description:
replacing collapsed bridges (between 3-metres and 200-metres long)
restoring access to roads washed out in storms
providing cost-effective temporary structures for roading projects
Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge Specifications:
Type | CB100 |
Designed Span | 6-60m |
Designed Load | HS25-44,Axle Load 20t,tracked load 50t |
Panel Dimension | 1.448*3.048m |
Carriageway Width | 4.2m/7.35m |
Deck type | steel deck/ wood deck |
Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge contains of girder, deck, frame connecting structure, bridge end structure and gateway structure. Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge girder is combined of panel, panel pin (include safety circlip) and chord reinforcement. CB 200 Metal Truss Bridge Compact Panel Bridge deck is combined of transom, Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge plate and kerb. Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge frame structure is combined of raker, bracing frame, vertical frame, sway brace and vertical component. Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge end section is combined of end post, lower bearing and frame plate. The gateway structure is combined of ramp, ramp bearing and end plate.
Harzone Industry was built in 1967, one of the subsidiary units of China State Shipbuilding Corporation Limited(CSSC), a state-owned and protected military company. Over the past four decades, the leaders of both the Party and nation have been caring for the growth of the company. Chairman Mao underlined the documents for the factory establishment. Later, ZhangAiping., one General, and Chen Shiju, one commander, inscribed name for the company. In 2008, Mr. He Guoqiang, Standing Committee of Political Bureau of CPC Central Committee, Secrrtary of the Discipline Inspection Commission of CPC Central Committee had paid a visit to the company and inspected the workshop and saw the erection of the mechanized bridge, who also encouraged the company to develope well.
Contact Person: chinaharzone
Tel: +8613871570243