Product Details:
Payment & Shipping Terms:
|
Product Name: | Easy Disassembling Long Service Life Steel Bridge: | Spans: | 36-81m |
---|---|---|---|
Surface Protection: | Hot-dip Galvanized | Color: | Green Or Customized |
Standard: | GB,AiSi, ASTM, BS | Application: | Permanent Bridge |
Warranty: | One Year For Main Parts | Grade: | Q345B |
High Light: | Easy Disassembling Steel Girder Bridge,Composite Steel Girder Bridge,Steel Composite Girder Bridge |
42m Simple Structure Suspension Bridge Steel Bridge are deck bridges which are used for short and medium spans, for highway bridges composite deck construction is generally used unless the depth is very critical in which case half-through girders or through trusses may be necessary.
42m Simple Structure Suspension Bridge Steel Bridge surface protection can be paint or hot-dip galvanized.
42m Simple Structure Suspension Bridge Steel Bridge load capacity, width can be designed according to user's requirements
Introduction of Easy Disassembling Long Service Life Steel Bridge:
42m Simple Structure Suspension Bridge Steel Bridge is a standard bridge equipment, adopted extensively and the most popular in the world
Advantage of Easy Disassembling Long Service Life Steel Bridge:
Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
great stability and long fatigue life
being capable of an alternative span, loading capacity
Features of Easy Disassembling Long Service Life Steel Bridge:
1. High strength and big stiffness , relative to the concrete bridge can be reduced trabecular high and self-respect
2. Steel bridge generally USES factory, site splicing, the construction period is short, processing convenient and not affected by seasonal effect.
3. Steel bridge is suitable for industrialized manufacture and very convenient to transport.
4. Steel bridge is easy to repair and replace,long lifetime,material can be recycled.
Application of Easy Disassembling Long Service Life Steel Bridge:
Beam bridge,arch bridge,rigid frame bridge,cable-stayed bridge,suspension bridge. passenger foot-bridge
Competitive Advantage of Easy Disassembling Long Service Life Steel Bridge:
Heavy loading capacity
Used as permanent bridge
Good stability
Simple in structure
Long service life
No headroom limit
No width limit
Harzone Industry was built in 1967, one of the subsidiary units of China State Shipbuilding Corporation Limited(CSSC), a state-owned and protected military company. Over the past four decades, the leaders of both the Party and nation have been caring for the growth of the company. Chairman Mao underlined the documents for the factory establishment. Later, ZhangAiping., one General, and Chen Shiju, one commander, inscribed name for the company. In 2008, Mr. He Guoqiang, Standing Committee of Political Bureau of CPC Central Committee, Secrrtary of the Discipline Inspection Commission of CPC Central Committee had paid a visit to the company and inspected the workshop and saw the erection of the mechanized bridge, who also encouraged the company to develope well.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884