Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsBailey Bridge

Cb250 Prefabricated Steel Bailey Suspension Bridge Length 25-87.6m

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

Cb250 Prefabricated Steel Bailey Suspension Bridge Length 25-87.6m

Cb250 Prefabricated Steel Bailey Suspension Bridge Length 25-87.6m
Cb250 Prefabricated Steel Bailey Suspension Bridge Length 25-87.6m

Large Image :  Cb250 Prefabricated Steel Bailey Suspension Bridge Length 25-87.6m

Product Details:
Place of Origin: CHINA
Brand Name: HARZONE
Model Number: CB100
Payment & Shipping Terms:
Minimum Order Quantity: Negotiation
Packaging Details: According to detailed order
Delivery Time: Negotiation
Payment Terms: According to detailed order
Detailed Product Description
Name: CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge Brand Name: China Harzone
Material: Steel Bridge Width: 3.7m
Length: 35-87.6m Load: HS20-44
High Light:

prefabricated bailey suspension bridge

,

cb250 steel bailey suspension bridge

,

length 25m bailey truss bridge

CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge

CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge(also is named compact panel bridge or PSB) are manufactured by China Harzone Industry Corp., Ltd. 60ft bridge are Single-single construction, and the 90ft bridge are Double-Single Reinforced 2 (DSR2) construction according to the request made by the owner. We provide the all the components except the launching tools.

 

Panel of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge

The panels of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge are monolithic unit welded in the factory and assembled by panel pin on the construction site, and the main structures are assembled according with the request of span and loading. 

 

End system of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge

The bridge end of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge is composed of post end male, post end female, tie beam, bearing and bearing plate.

 

Launching equipment and tools  of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge

The launching equipment and tools of  CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge are made up of nose, roller, rock roller, joint, bolt and various spanners. The max loading of roller is 25t and the rock roller id 6t. The nose is netlike structure assembled by bridge components (not offered in this project).

The mechanical properties of Q345B

Yield point,σs MPa

Tensile strength

σb MPa

Extend rate

δs,

Work of concussion,Akv, (vertical), J

180obending test

d= dia.

a= thickness(dia.)

thickness(dia.,side length),mm +20℃ 0℃ -20℃ -40℃
≤16 >16~35 >35~50 >50~100 Not less than thickness(dia., mm)
Not less than ≤15 >16~100
345 325 295 275 470~630 21   34     d=2a d=3a

 

Before offering the quotation, we need to know the exact usage condition so that we can propose a proper technical specification. Hereon, pls kindly supply the following information as detailed as possible:

  1. Type of Bridge
  2. Span, Centre to Centre of Bearing of Supports (Bridge Length)
  3. Type of Deck
  4. bridge Width
  5. Sidewalk
  6. Design Loading
  7. Environmental Condition
  8. Life service requirement ( for how many years the bridge is intended for use)
  9. Regarding the form of anti-corrosion, is it paint (what is the color requirement?) or hot-dip galvanizing?
  10. Quotation terms (FOB which port or other)
  11. Better if there are site pictures can be provided.

Please feel free to contact with us if you have any questions.

 

Cb250 Prefabricated Steel Bailey Suspension Bridge Length 25-87.6m 0

 

Cb250 Prefabricated Steel Bailey Suspension Bridge Length 25-87.6m 1

 

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)