Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsSteel Truss Bridge

54m Emergency Prefabricated Truss Bridge Bailey

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

54m Emergency Prefabricated Truss Bridge Bailey

54m Emergency Prefabricated Truss Bridge Bailey
54m Emergency Prefabricated Truss Bridge Bailey

Large Image :  54m Emergency Prefabricated Truss Bridge Bailey

Product Details:
Place of Origin: Hubei,China
Brand Name: China Harzone
Certification: ISO9001:2015
Payment & Shipping Terms:
Minimum Order Quantity: 1set
Price: Negotiated
Supply Ability: 50000 Ton/Tons per Year
Detailed Product Description
Name: 54m Emergency Bridge Steel Truss Bridge Grade: Q345B Steel
Place Of Origin: Hubei,China Type: Steel Bridge
Processing Service: Bending, Welding, Decoiling, Cutting, Punching Certificate: ISO9001:2015
Color: According To Client Requirement Structure Type: Bailey Bridge Bridge
Installation: Engineers Guidance Supply Ability: 40000 Ton/Tons Per Year
High Light:

54m Prefabricated Truss Bridge

,

Bailey Prefabricated Truss Bridge

,

Emergency Prefabricated Steel Truss Bridge

54m Emergency Bridge Steel Truss Bridge

 

Description of 54m Emergency Bridge Steel Truss Bridge

 

54m Emergency Bridge Steel Truss Bridge adopts prefabricated strategy, featuring a big span, small construction period, steadfast erection, multiple reuses of bridge components.54m Emergency Bridge Steel Truss Bridge has outstanding interchangeability and connection ferformance. 54m Emergency Bridge Steel Truss Bridge structure can be designed according to the bridge span and load requirement,which can rapidly construct a impermanent or semi-permanent bridge.


54m Emergency Bridge Steel Truss Bridge surface protection can be paint or hot-dip galvanized.

 

 Advantage of 54m Emergency Bridge Steel Truss Bridge:


Possessing the features of simple structure,
great stability and long fatigue life
being capable of an alternative span, loading capacity

 

Specifications of 54m Emergency Bridge Steel Truss Bridge:

 

Type  CB100
Designed Span 6-60m
Designed Load HS25-44,Axle Load 20t,tracked load 50t
Panel Dimension 1.448*3.048m
Carriageway Width 4.2m/7.35m
Deck type steel deck/ wood deck

 

 

54m Emergency Prefabricated Truss Bridge Bailey 0

 

54m Emergency Prefabricated Truss Bridge Bailey 154m Emergency Prefabricated Truss Bridge Bailey 2

 

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)