Product Details:
Payment & Shipping Terms:
|
Material: | Steel Bridge | Feature: | Reusable |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Structure: | Simple |
Status: | Sefl Fold And Unfold | ||
High Light: | military Bridge,Wheel Bridge |
Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 60t / 17t Load
Heavy Mountain Bridge is sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle. It is mainly used to erect a bridge with a length of 21m long and a width of 3.3m to ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to go across small medium rivers and dry gaps rapidly.
Specifications for Heavy Mountain Bridge |
|
Tracked load / axle load |
55t / 17t |
Outline dimension (L*W*H) |
13*3.3*3.6m |
Gross weight |
32.5t |
Bridge weight |
10.5t |
Bridge length |
21m |
Negotiating length (on hard banks) |
19m |
Section length |
10.63m |
Bridge width (when expanding) |
3.3m |
Track width |
1.15m |
Section height |
0.95m |
End section height |
0.35m |
Operator |
2-3 |
Erection time |
10 min |
Max. longitudinal slope / lateral slope |
±10% / ±5% |
Allowable bank height difference |
5% |
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884