|
Product Details:
Payment & Shipping Terms:
|
Material: | Metal Bridge | Feature: | Reusable Bridge |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Structure: | Uncomplicated |
Status: | Sefl Fold And Unfold | ||
High Light: | mechanized fast bridge,21m length fast bridge,uncomplicated fast bridge |
Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length
Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length is sort of emergency equipment carried by vehicle and completes erection and retrieval by erection car. It is mostly used to erect a bridge with a length of 21m and a width of 3.3m to ensure all varieties of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to traverse small medium rivers and dry gaps hastily.
Specifications for Heavy Mountain Bridge |
|
Tracked load / axle load |
55t / 17t |
Outline dimension (L*W*H) |
13*3.3*3.6m |
Gross weight |
32.5t |
Bridge weight |
10.5t |
Bridge length |
21m |
Negotiating length (on hard banks) |
19m |
Section length |
10.63m |
Bridge width (when expanding) |
3.3m |
Track width |
1.15m |
Section height |
0.95m |
End section height |
0.35m |
Operator |
2-3 |
Erection time |
10 min |
Max. longitudinal slope / lateral slope |
±10% / ±5% |
Allowable bank height difference |
5% |
Contact Person: chinaharzone
Tel: +8613871570243