Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsMechanized Bridge

Uncomplicated Mechanized Fast Bridge With 21m Length

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

Uncomplicated Mechanized Fast Bridge With 21m Length

Uncomplicated Mechanized Fast Bridge With 21m Length
Uncomplicated Mechanized Fast Bridge With 21m Length Uncomplicated Mechanized Fast Bridge With 21m Length

Large Image :  Uncomplicated Mechanized Fast Bridge With 21m Length

Product Details:
Place of Origin: China
Brand Name: Harzone
Payment & Shipping Terms:
Minimum Order Quantity: negotiation
Packaging Details: According to detailed order
Delivery Time: negotiation
Payment Terms: According to detailed order
Detailed Product Description
Material: Metal Bridge Feature: Reusable Bridge
Capacity: Heavy Loading Capacity Structure: Uncomplicated
Status: Sefl Fold And Unfold
High Light:

mechanized fast bridge

,

21m length fast bridge

,

uncomplicated fast bridge

Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length                                           
                                                                

Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length is sort of emergency equipment carried by vehicle and completes erection and retrieval by erection car. It is mostly used to erect a bridge with a length of 21m and a width of 3.3m to ensure all varieties of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to traverse small medium rivers and dry gaps hastily.             
     Uncomplicated Mechanized Fast Bridge With 21m Length 0     
               

Specifications for Heavy Mountain Bridge

Tracked load / axle load

55t / 17t

Outline dimension (L*W*H)

13*3.3*3.6m

Gross weight

32.5t

Bridge weight

10.5t         

Bridge length

21m

Negotiating length (on hard banks)

19m

Section length

10.63m

Bridge width (when expanding)

3.3m

Track width

1.15m

Section height

0.95m

End section height

0.35m

Operator

2-3

Erection time

10 min

Max. longitudinal slope / lateral slope

±10%  / ±5%

Allowable bank height difference

5%

 

 

 

 

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)