|
Product Details:
Payment & Shipping Terms:
|
Material: | Steel Bridge | Feature: | Reusable |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Structure: | Simple |
Status: | Sefl Fold And Unfold | ||
High Light: | iron mechanized bridge,3.3m width mechanized bridge,Mechanized Bridge For Emergency |
Iron Fast Bridge / Emergency Bridge / Mechanized Bridge
Iron Fast Bridge / Emergency Bridge / Mechanized Bridge With 21m Length is mainly used to found a bridge with a length of 21m long and a width of 3.3m to guarantee all classes of trucks with a tracked load of up to 60 tons or an axle load of up to 17 tons to go through small medium rivers and dry gaps promptly. It is sort of emergency equipment carried by automobile and does erection and retrieval by erection vehicle.
Specifications for Heavy Mountain Bridge |
|
Tracked load / axle load |
55t / 17t |
Outline dimension (L*W*H) |
13*3.3*3.6m |
Gross weight |
32.5t |
Bridge weight |
10.5t |
Bridge length |
21m |
Negotiating length (on hard banks) |
19m |
Section length |
10.63m |
Bridge width (when expanding) |
3.3m |
Track width |
1.15m |
Section height |
0.95m |
End section height |
0.35m |
Operator |
2-3 |
Erection time |
10 min |
Max. longitudinal slope / lateral slope |
±10% / ±5% |
Allowable bank height difference |
5% |
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884