|
Product Details:
Payment & Shipping Terms:
|
Material: | Steel Bridge | Feature: | Recyclable |
---|---|---|---|
Capacity: | Weighty Loading Capacity | Structure: | Humble |
Status: | Self Fold And Unfold | ||
Highlight: | reusable mechanised bridge,returnable mechanised bridge,Reflex mechanised bridge |
Reusable Fast Bridge / Emergency Bridge / Mechanized Bridge
Returnable Fast Bridge / Emergency Bridge / Reflex Bridge With 21m Length is largely used to erect a bridge with a length of 21m long and a width of 3.3m to ensure all types of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to go across small medium rivers and dry gaps rapidly. It is sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle.
Specifications for Heavy Mountain Bridge |
|
Allowable bank height difference | 5% |
Tracked load / axle load |
55t / 17t |
Outline dimension (L*W*H) |
13*3.3*3.6m |
Gross weight |
32.5t |
Bridge weight |
10.5t |
Bridge length |
21m |
Negotiating length (on hard banks) |
19m |
Section length |
10.63m |
Bridge width (when expanding) |
3.3m |
Track width |
1.15m |
Section height |
0.95m |
End section height |
0.35m |
Operator |
2-3 |
Erection time |
10 min |
Max. longitudinal slope / lateral slope |
±10% / ±5% |
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884