Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsMechanized Bridge

Iron Simple 55t Tracked Mechanized Bridge

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

Iron Simple 55t Tracked Mechanized Bridge

Iron Simple 55t Tracked Mechanized Bridge
Iron Simple 55t Tracked Mechanized Bridge Iron Simple 55t Tracked Mechanized Bridge

Large Image :  Iron Simple 55t Tracked Mechanized Bridge

Product Details:
Place of Origin: China
Brand Name: Harzone
Model Number: Mechanized Bridge
Payment & Shipping Terms:
Minimum Order Quantity: negotiation
Packaging Details: According to detailed order
Delivery Time: negotiation
Payment Terms: According to detailed order
Detailed Product Description
Material: Iron Bridge Feature: Durable
Capacity: High Loading Capacity Structure: Simple Structure
Status: Unfold And Sefl Fold Name: Simple Structure Mechanized Bridge
High Light:

simple structure mechanized bridge

,

Iron mechanized bridge

,

55t tracked mechanized bridge

Simple Structure Fast Bridge Emergency Bridge Mechanized Bridge                                          
                                                                
Simple Structure Fast Bridge Emergency Bridge Mechanized Bridge With an axle load of up to 17 tons or a tracked load of up to 60 tons and 21m Length is mainly used to raised a bridge with a width of 3.3m and  a length of 21m long ,and  all sorts of vehicles to go across small medium rivers and dry gaps rapidly. and make sure sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle.                                  
     Iron Simple 55t Tracked Mechanized Bridge 0     
               

Specifications for Heavy Mountain Bridge

Operator 2-3
Erection 10 min
Max. longitudinal slope / lateral slope ±10% / ±5%
Allowable bank height difference 5%

Tracked / axle load

55t / 17t

Outline dimension (L*W*H)

13*3.3*3.6m

Gross weight

32.5t

Bridge weight

10.5t         

Bridge length

21m

Negotiating length (on hard banks)

19m

Section length

10.63m

Bridge width (when expanding)

3.3m

Track width

1.15m

Section height

0.95m

End section height

0.35m

 

 

 

 

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)