Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsMechanized Bridge

21m Fast Erection Emergency Bridge For Accident

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

21m Fast Erection Emergency Bridge For Accident

21m Fast Erection Emergency Bridge For Accident
21m Fast Erection Emergency Bridge For Accident

Large Image :  21m Fast Erection Emergency Bridge For Accident

Product Details:
Place of Origin: China
Brand Name: Harzone
Payment & Shipping Terms:
Minimum Order Quantity: negotiation
Packaging Details: According to detailed order
Delivery Time: negotiation
Payment Terms: According to detailed order
Detailed Product Description
Product Name: 21m Mechanized Bridge Material: Iron
Feature: Reusable Brigde Status: Sefl Fold And Unfold
High Loading Capacity: Tracked Load-60t, Wheeled Load-13t Usage: Overcoming Dry Gaps
High Light:

21m emergency bridge

,

fast erection emergency bridge

,

accident emergency bridge

21m Fast Erection Emergency Bridge For Accident / Mechanized Bridge 

Introduction of Mechanized Bridge

21m Mechanized Bridge  is a set of mechanized bridge equipment carried by vehicle, accomplishing bridge erection and retrieval by itself.

 

Main Features of Mechanized Bridge

 

Excellent cross country performance using 8×8 military cross country chassis
Fast erection 10min
Less operators 2-3
High loading capacity Tracked load-60t, wheeled load-13t

 

Usage of Mechanized Bridge

 

21m Mechanized Bridge is main used as 3.3m wide,21m/24m long temporary bridge for overcoming dry gaps,small medium rivers and craters, ensure all sorts of castles with an axle load of up to 13 tons or a tracked load of up to 60 tons to go across rapidly.

 

Basic composition of Mechanized Bridge

 

The span is folded on the chassis when transportation and erected by chassis. The auxiliary equipment is used to help with erecting and fixing.It is mainly composed of chassis,span and auxiliary equipment. 

Mechanized Bridge Picture

21m Fast Erection Emergency Bridge For Accident 0

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)