Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsMechanized Bridge

21-24M Fast Erecion Military Mobile Bridge For Overcoming Small River

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

21-24M Fast Erecion Military Mobile Bridge For Overcoming Small River

21-24M Fast Erecion Military Mobile Bridge For Overcoming Small River
21-24M Fast Erecion Military Mobile Bridge For Overcoming Small River

Large Image :  21-24M Fast Erecion Military Mobile Bridge For Overcoming Small River

Product Details:
Place of Origin: China
Brand Name: Harzone
Payment & Shipping Terms:
Minimum Order Quantity: negotiation
Packaging Details: According to detailed order
Delivery Time: negotiation
Payment Terms: According to detailed order
Detailed Product Description
Material: Steel\iron Bridge Feature: Fast Erecion
Capacity: 60T Structure: Simple Structure
Name: Military Bridge Bridge Length: 21-24M
High Light:

24M Military Mobile Bridge

,

21M Military Mobile Bridge

,

21M army portable bridge

21-24M Fast Erecion Military Bridge For Overcoming Small River

1.  Introduction of 21-24M Fast Erection Military Bridge 

A set of 21-24M Fast Erecion Military Bridge equipment carried by vehicle, accomplishing bridge erection and retrieval by itself.

 

2. Usage of 21-24M Fast Erection Military Bridge

21-24M Fast Erecion Military Bridge main used as 3.3m wide,24m or 21m long temporary channels for overcoming small river, dry gap and craters, ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 13 tons to go across.

 

3. Basic composition

21-24M Fast Erecion Military Bridge is mainly composed of auxiliary, span and chassis equipment. The brdige is folded on the chassis when transportation and erected by chassis. The auxiliary equipment is used to help with erecting and fixing.

 

4. Main Features of 21-24M Fast Erection Military Bridge

Fast erection 10min
Less operators 2-3
Excellent cross country performance using 8×8 military cross country chassis
High loading capacity Tracked load-60t, wheeled load-13t

 

21-24M Fast Erecion Military Mobile Bridge For Overcoming Small River 0

Harzone Industry was built in 1967, one of the subsidiary units of China State Shipbuilding Corporation Limited(CSSC), a state-owned and protected military company. Over the past four decades, the leaders of both the Party and nation have been caring for the growth of the company. Chairman Mao underlined the documents for the factory establishment. Later, ZhangAiping., one General, and Chen Shiju, one commander, inscribed name for the company. In 2008, Mr. He Guoqiang, Standing Committee of Political Bureau of CPC Central Committee, Secrrtary of the Discipline Inspection Commission of CPC Central Committee had paid a visit to the company and inspected the workshop and saw the erection of the mechanized bridge, who also encouraged the company to develope well.
Right now, the company has one research center in Wuhan, which is the national degree, one trading center in Beijing, one manufactuing center in Chibi, three offices in Gana, Ethiopia and Peru.
Harzone Industry has enjoyed a proud history, it must also create a bridge future.

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)