Product Details:
Payment & Shipping Terms:
|
Material: | Steel Bridge | Feature: | Reusable |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Structure: | Simple |
Status: | Sefl Fold And Unfold | ||
High Light: | 75min Mechanized Bridge,Simple Structure Mechanized Bridge,Simple Structure modular bridge construction |
Erection Time 75min Axle Load Lt-20 Simple Structure Mechanized Bridge
Description:
Erection Time 75min Axle Load Lt-20 Simple Structure Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
Erection Length 17m, 25.5m, 34m, 42.5m, 51m Axle Load Lt-20 Simple Structure Mechanized Bridge possesses the feature of good flexibility, big single span, simple structure, speedy erection, high mechanization and less manpower. Besides, it has the advantages of convenient transportation and favorable adaptability of bank.
Specification: |
Curb weight of erection vehicle (including 3 men) 32.5t |
Curb weight of transport vehicle 20.8t |
Bridge bay weight: 9.2t |
Design load: tracked load LD-60 |
Wheeled (load on axle) LT-20 |
Erection length 17m, 25.5m, 34 m, 42.5 m, 51 m |
Erection width 4m |
Erection time (complete bridge) 75min |
Retrieval time (complete bridge) 75min |
Operator 6~7 men (not including drivers of transport vehicles) |
China Harzone is one of the most professional “steel truss bridge” manufacturers all over the world and we always make our effort to provide our best service and products to our clients. So far, over 40 countries in Asia, Africa and Latin America have purchased our products, including Myanmar, Thailand, Peru, Ecuador, Sudan, Pakistan, Laos and so on.
China Harzone has enjoyed a proud history, it must also create a bridge future.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884