Product Details:
Payment & Shipping Terms:
|
Material: | Iron Bridge | Status: | Sefl Fold |
---|---|---|---|
Feature: | Reusable | Capacity: | Axle Load 13t |
Product Name: | Axle Load 13t Mechanized Bridge Emergency Bridge | Type: | Modular Emergency Bridge |
High Light: | 60t Mechanized Bridge,Tracked Mechanized Bridge,60t Temporary Modular Bridge |
Description:
Tracked Load 60t Mechanized Bridge Modular Fast Bridge is an emergency bridge equipment with bridge trestle, which can accomplish continuous multi-span erection.It's a set of equipment mainly used for bridging small and medium rivers, dry gaps and marshland with a length within 75m and a depth within 5.5m to ensure all sorts of tanks, artilleries and vehicles, and personnel to get across.
The complete set consists of five transport vehicles with bridge spans with a length of 15m. The chassis is type XC2300/8×8 15T class cross-country truck, with advanced engine, gearbox and axles etc.
The trestles are controlled by hydraulic winch; the outriggers ban be adjusted by automatic control technology, with double class hydraulic cylinders. Tracked Load 60t Mechanized Bridge Modular Fast Bridge is erected with shear style erection, and span stretching at mean time to keep safety and stability in erection.
Usage
Tracked Load 60t Mechanized Bridge Modular Fast Bridge is used to ensure all kinds of military vehicles with tracked load up to 60t and wheeled load up to 13t to overcome medium and small rivers, dry ditches and marsh lands.
No | Item | Data |
1 | Loading capacity | |
Tracked load | 60t | |
Wheeled load | 13t | |
2 | Single span length | 15m |
3 | Total length of one whole set | 75m |
4 | Carriage way width | 3.8m |
5 | Adjusting height of trestle | |
Max. | 5.5m | |
Min. | 3.32m | |
6 | Erection time | |
Single span | 9~11min | |
Whole set | 55~65min | |
7 | Allowed max water velocity | 2m/sec |
8 | Operators | |
single span | 7 | |
whole set | 13 | |
9 | Total weight | 30.6t |
10 | Outline dimension(L×W×H) | ≤11800mm*3200mm*3700mm |
Main features
Good flexibility: using 8×8 cross country chassis
Continuous erection: bridge length unlimited
Fast erection: 9-11min (single span)
High mechanization level &low labor intensity: remote control
High loading capacity: tracked load 60t, wheeled load 30t
Less operators: 7(single span), 13(one set)
China Harzone was built in 1967, one of the subsidiary units of China State Shipbuilding Corporation Limited(CSSC), a state-owned and protected military company. Over the past four decades, the leaders of both the Party and nation have been caring for the growth of the company. Chairman Mao underlined the documents for the factory establishment. Later, ZhangAiping., one General, and Chen Shiju, one commander, inscribed name for the company. In 2008, Mr. He Guoqiang, Standing Committee of Political Bureau of CPC Central Committee, Secrrtary of the Discipline Inspection Commission of CPC Central Committee had paid a visit to the company and inspected the workshop and saw the erection of the mechanized bridge, who also encouraged the company to develope well.
Righe now, the company has one research center in Wuhan, which is the national degree, one trading center in Beijing, one manufactuing center in Chibi, three offices in Gana, Ethiopia and Peru.
China Harzone has enjoyed a proud history, it must also create a bridge future.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884