Product Details:
Payment & Shipping Terms:
|
Material: | Steel Bridge | Feature: | Reusable |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Structure: | Simple |
Status: | Sefl Fold And Unfold | ||
Highlight: | 75min Mechanized Bridge,Emergency Mechanized Bridge,75min steel truss bridge |
Erection Time 75min Mechanized Bridge Emergency Equipment
Description of Erection Time 75min Mechanized Bridge Emergency Equipment:
Erection Time 75min Mechanized Bridge Emergency Equipment is a set of mechanized bridge with big single span passed by vehicle. One complete set of equipment contains of one erection vehicle and six transport cars with bridge bays, which can be gathered into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.
Techincal specification:
Composition of one set | Launching Vehicle:1 Bridge Transporters:6. Support vehicle:1 |
Curb weight of launching vehicle | 33t |
Curb weight of bridge transporter | 21t |
Launching vehicle dimension | 13600*3200*3470mm |
bridge transporter dimension | 12000*3400*3500mm |
design tracked load | 60t |
design axle load | 13t |
bridge length | 17m,25.5m,34m,42.5m,51m |
bridge width | 4m |
erection/retrieval time | 75min |
operating staff | 6-7 |
Sefl Fold And Unfold Emergency Equipment Mechanized Bridge possesses the feature of respectable flexibility, large single span, simple structure, speedy erection, high mechanization and less manpower. Moreover, it has the advantages of convenient transportation and favorable adaptability of bank.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884