Product Details:
Payment & Shipping Terms:
|
Structure: | Simple | Status: | Sefl Fold And Unfold |
---|---|---|---|
Product Name: | Erection/Retrieval Time 75min Emergency Equipment Heavy Duty Bridge | Condition: | New |
Warranty: | 1 Year | Span: | 13-51m |
High Light: | 51m Emergency Temporary Bridge,truss temporary steel bridge,51m temporary steel bridge |
Launching Vehicle Dimension 13600*3200*3470mm Emergency Equipment 51m Fast Bridge
Description of Launching Vehicle Dimension 13600*3200*3470mm Emergency Equipment 51m Fast Bridge:
Erection/Retrieval Time 75min Emergency Equipment Heavy Duty Bridge is a set of mechanized bridge with large particular span passed by vehicle. The whole set of Erection/Retrieval Time 75min Emergency Equipment Heavy Duty Bridge contains of one erection vehicle and six transport cars with bridge bays, which can be gathered into an emergency bridge rapidly to safeguard all sorts of vehicles to go across quickly.
Techincal specification of Launching Vehicle Dimension 13600*3200*3470mm Emergency Equipment 51m Fast Bridge:
erection/retrieval time | 75min |
Composition of one set | Launching Vehicle:1 Bridge Transporters:6. Support vehicle:1 |
operating staff | 6-7 |
Curb weight of launching vehicle | 33t |
Curb weight of bridge transporter | 21t |
Launching vehicle dimension | 13600*3200*3470mm |
bridge transporter dimension | 12000*3400*3500mm |
design tracked load | 60t |
design axle load | 13t |
bridge length | 17m,25.5m,34m,42.5m,51m |
bridge width | 4m |
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884