Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsMechanized Bridge

Folded Outline 10890*3150*3660 Mm Heavy Mechanized Bridge Modular Fast Erection

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

Folded Outline 10890*3150*3660 Mm Heavy Mechanized Bridge Modular Fast Erection

Folded Outline 10890*3150*3660 Mm Heavy Mechanized Bridge Modular Fast Erection
Folded Outline 10890*3150*3660 Mm Heavy Mechanized Bridge Modular Fast Erection

Large Image :  Folded Outline 10890*3150*3660 Mm Heavy Mechanized Bridge Modular Fast Erection

Product Details:
Place of Origin: China
Brand Name: Harzone
Payment & Shipping Terms:
Minimum Order Quantity: negotiation
Packaging Details: According to detailed order
Delivery Time: negotiation
Payment Terms: According to detailed order
Detailed Product Description
Material: Iron Capacity: Heavy Loading Capacity
Structure: Simple Status: Sefl Fold And Unfold
Product Name: Folded Outline Dimension (L*W*H) 10890*3150*3660 Mm Modular Fast Erection Heavy Mechanized Bridge Condition: New Equipment
Certification: ISO
High Light:

Heavy Mechanized Bridge

,

Modular Mechanized Bridge

,

Fast Erection Mechanized Bridge

Folded Outline Dimension (L*W*H) 10890*3150*3660 Mm Modular Fast Erection Heavy Mechanized Bridge

 

China Harzone dedicates itself to the following fields:

Design and manufacturing of military bridges and emergency rescue equipment

Design,manufacturing and installation of various kinds of steel bridges and steel structures

Research and re-fitting of special-purpose vehicles and equipment

Engineering contracting

Import and Export trading business

 

China Harzone  has enjoyed a proud history, it must also create a bridge future.

 

Description of Folded Outline Dimension (L*W*H) 10890*3150*3660 Mm Modular Fast Erection Heavy Mechanized Bridge:                                                                                  
                                                                

Folded Outline Dimension (L*W*H) 10890*3150*3660 Mm Modular Fast Erection Heavy Mechanized Bridge is a set of equipment mainly used for bridging small and medium rivers, dry gaps and marshland with a length within 75m and a depth within 5.5m to ensure all sorts of tanks, artilleries and vehicles, and personnel to get across.

 

Specification of 5 Transport Vehicles Modular Fast Erection Heavy Mechanized Bridge:

 

Total weight 30.6t
Folded outline dimension (L*W*H) 10890*3150*3660 mm
Tracked load 60t
Axle load 13t
Roadway width 3.8m
Span length 15m
Max. bridge length 75m
Max. height (from shoes to deck) 5.5m
Erection time for a single span 12 min
Max. current velocity 2m/s
Operator 7 operators for a single span

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Folded Outline 10890*3150*3660 Mm Heavy Mechanized Bridge Modular Fast Erection 0Folded Outline 10890*3150*3660 Mm Heavy Mechanized Bridge Modular Fast Erection 1

 

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)