Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsMechanized Bridge

Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge

Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge
Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge

Large Image :  Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge

Product Details:
Place of Origin: China
Brand Name: Harzone
Payment & Shipping Terms:
Minimum Order Quantity: Negotiation
Packaging Details: According to detailed order
Delivery Time: Negotiation
Payment Terms: According to detailed order
Detailed Product Description
Tires Specification: 11.00R20 12PR,12R22.5 12PR,11R22.5 12PR Tractor Power: 275kw
Max Saddle Load: 16000kg Name: Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge
Less Operators: 2-3 Payment: According To Detailed Order
Brand Name: China Harzone
High Light:

tank semi trailer

,

semi tank trailers

,

truck semi trailer

Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge

 

Introduction of Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge

Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge is a set of mechanized bridge equipment carried by vehicle, accomplishing bridge erection and retrieval by itself.

 

Main Features of Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge

 

1 Fast erection: 10min

2 Less operators: 2-3

3 Excellent cross country performance: using 8×8 militarycross country chassis

4 High level of mechanization & low labor intensity: using remote control operation

5 High loading capacity: Tracked load-60t, wheeled load-13t

 

Basic composition of Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge

 

The span is folded on the chassis when transportation and erected by chassis. Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge is used to help with erecting and fixing.It is mainly composed of chassis,span and auxiliary equipment.

 

Usage of Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge

Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge is main used as 21m long, 3.3m wide short-lived stations for overcoming small medium rivers, dry gaps and craters, guarantee all kinds of vehicles with a tracked load of up to 60 tons or an axle load of up to 13 tons to go across quickly.

 

 

SLess Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge Pictures

Less Operators: 2-3 Wheeled Load-13t HZ21 Fast Bridge 0

 

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)