Product Details:
Payment & Shipping Terms:
|
Material: | Iron | Feature: | Fast Erection |
---|---|---|---|
Capacity: | High Loading Capacity | Product Name: | Negotiating Depth ±3m Mechanized Bridge Fast Bridge |
Condition: | New | Warranty: | 1 Year |
Application: | Emergency Equipment | Span: | 17、25.5、34、42.5、51m |
Standard: | AISI GB BS GB/BS | Color: | Clients' Requirments |
High Light: | high loading capacity fast bridge,iron fast bridge mechanized,high loading capacity mechanized bridge |
Negotiating Depth ±3m Mechanized Bridge Fast Bridge
Description of Negotiating Depth ±3m Mechanized Bridge Fast Bridge:
Negotiating Depth ±3m Mechanized Bridge Fast Bridge is a set of mechanized bridge with long single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.
The whole set of Negotiating Depth ±3m Mechanized Bridge Fast Bridge is composed of three parts: bridge span, erection vehicle and transportation vehicle.
Main features of Negotiating Depth ±3m Mechanized Bridge Fast Bridge:
1 Fast erection: 90min (To erect a 51m bridge)
2 Excellent cross country performance: Cross country chassis (8×8 erection vehicle, 6×6 transportation vehicle)
3 Less operators: 3-4(not including drivers)
4 Large single span: max. single span reaches 51m
5 High mechanization level, low labor intensity: using remote control operation
6 Less composition unit: one erection vehicle, six transportation vehicle
Technical parameters of Heavy Loading Capacity Less Operators 3-4 Mechanized Bridge Fast Bridge:
No | Item | Data |
1 | Curb weight of erection vehicle | 33t |
2 | Curb weight of transportation vehicle | 21t |
3 | Dimension of erection vehicle (L×W×H ) | 13.6m×3.2m×3.47m |
4 | Dimension of transportation vehicle (L×W×H ) | 12m×3.4m×3.5m |
5 | Load capacity | |
Tracked load | 60T | |
Wheeled load | 13T | |
6 | Life time | 10000 times |
7 | Erection length | 17m,25.5m,34m,42.5m,51m |
8 | Erection width | 4m |
9 | Negotiating depth: | ±3m |
10 | Erection maximum longitudinal gradient | 10% |
11 | Erection maximum transverse gradient | 5% |
12 | Erection time (complete bridge) | 90min |
13 | Retrieval time (complete bridge) | 90min |
14 | Operator(not including driver) | 3~4 |
15 | Ambient temperature | -41℃~+50℃ |
Negotiating Depth ±3m Mechanized Bridge Fast Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.
FAQ
1,How about quality control of your company?
Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.
2,Are you a factory or a trade company?
We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.
3,Where is your loading port?
Shanghai Port,Nanjing Port,Tianjin Port.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884