Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsMechanized Bridge

Erection Time 90 Min Complete Bridge Mechanized Fast

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

Erection Time 90 Min Complete Bridge Mechanized Fast

Erection Time 90 Min Complete Bridge Mechanized Fast
Erection Time 90 Min Complete Bridge Mechanized Fast

Large Image :  Erection Time 90 Min Complete Bridge Mechanized Fast

Product Details:
Place of Origin: China
Brand Name: Harzone
Payment & Shipping Terms:
Minimum Order Quantity: negotiation
Packaging Details: According to detailed order
Delivery Time: negotiation
Payment Terms: According to detailed order
Detailed Product Description
Feature: Fast Erection Capacity: High Loading Capacity
Product Name: Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge Condition: New
Warranty: 2 Year Application: Emergency Bridges
Span: 17-51m Standard: AISI GB BS GB/BS
High Light:

erection time 90 min mechanized bridge

,

mechanized bridge fast

,

mechanized complete bridge

Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge

 

Description of Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge:                                                              
                                      

Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge is a set of mechanized bridge with long single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.

 

The whole set of  Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge is composed of three parts: bridge span, erection vehicle and transportation vehicle.

 

Technical parameters of Erection Time (Complete Bridge) 90 Min Mechanized Bridge Fast Bridge​:

 

No Item Data
1 Load capacity  
  Tracked load 60T
Wheeled load 13T
2 Life time 10000 times
3 Erection length 17m,25.5m,34m,42.5m,51m
4 Erection width 4m
5 Negotiating depth: ±3m
6 Erection maximum longitudinal gradient 10%
7 Erection maximum transverse gradient 5%
8 Erection time (complete bridge) 90min
9 Retrieval time (complete bridge) 90min
10 Operator(not including driver) 3~4
11 Ambient temperature -41℃~+50℃

 

 

Erection Time 90 Min Complete Bridge Mechanized Fast 0Erection Time 90 Min Complete Bridge Mechanized Fast 1

FAQ

1,How about quality control of your company?

Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.

 

2,Are you a factory or a trade company?

We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.

 

3,Where is your loading port?

Shanghai Port,Nanjing Port,Tianjin Port.

 

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)