|
Product Details:
Payment & Shipping Terms:
|
Material: | Steel | Feature: | Reusable |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Status: | Sefl Fold And Unfold |
Product Name: | Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge | Condition: | New |
Warranty: | 1 Year | Application: | Emergency Bridges |
Span: | 17-51m | ||
High Light: | emergency mechanized bridge,operator 6 men mechanized bridge,mechanized emergency bridge |
Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge
Description of Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge:
Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge is a set of mechanized bridge with big single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.
Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.
Specification of Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge: |
Curb weight of erection vehicle (including 3 men) 32.5t |
Curb weight of transport vehicle 20.8t |
Bridge bay weight: 9.2t |
Design load: tracked load LD-60 |
Wheeled (load on axle) LT-20 |
Erection length 17m, 25.5m, 34 m, 42.5 m, 51 m |
Erection width 4m |
Erection time (complete bridge) 75min |
Retrieval time (complete bridge) 75min |
Operator 6~7 men (not including drivers of transport vehicles) |
Operator 6~7 Men (Not Including Drivers Of Transport Vehicles) Emergency Bridge Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
China Harzone dedicates itself to the following fields:
Design and manufacturing of military bridges and emergency rescue equipment
Design,manufacturing and installation of various kinds of steel bridges and steel structures
Research and re-fitting of special-purpose vehicles and equipment
Engineering contracting
Import and Export trading business
Harzone products have been exported to more than 40 countries and regions around the world and own a good reputation from international client.Moreover,China Harzone has been listed in the state emergency purchasing system and also the largest qualified rescue machinery supplier of the United Nations Emergency Procurement.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884