Product Details:
Payment & Shipping Terms:
|
Material: | Steel | Feature: | Reusable |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Status: | Sefl Fold And Unfold |
Product Name: | Tracked Load LD-60 Emergency Bridge Mechanized Bridge | Condition: | New |
Warranty: | 1 Year | Application: | Emergency Bridges |
Span: | 17-51m | ||
High Light: | complete emergency bridge,emergency bridge mechanized,mechanized bridge emergency |
Erection Time (Complete Bridge) 90min Emergency Mechanized Bridge
Description of Erection Time (Complete Bridge) 90min Emergency Mechanized Bridge:
Erection Time (Complete Bridge) 90min Emergency Mechanized Bridge is a set of mechanized bridge with big single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.
Erection Time (Complete Bridge) 90min Emergency Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.
No | Item | Data |
1 | Curb weight of erection vehicle | 33t |
2 | Curb weight of transportation vehicle | 21t |
3 | Dimension of erection vehicle (L×W×H ) | 13.6m×3.2m×3.47m |
4 | Dimension of transportation vehicle (L×W×H ) | 12m×3.4m×3.5m |
5 | Load capacity | |
Tracked load | 60T | |
Wheeled load | 13T | |
6 | Life time | 10000 times |
7 | Erection length | 17m,25.5m,34m,42.5m,51m |
8 | Erection width | 4m |
9 | Negotiating depth: | ±3m |
10 | Erection maximum longitudinal gradient | 10% |
11 | Erection maximum transverse gradient | 5% |
12 | Erection time (complete bridge) | 90min |
13 | Retrieval time (complete bridge) | 90min |
14 | Operator(not including driver) | 3~4 |
15 | Ambient temperature | -41℃~+50℃ |
Erection Time (Complete Bridge) 90min Emergency Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
FAQ
1,How about quality control of your company?
Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.
2,Are you a factory or a trade company?
We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.
3,Where is your loading port?
Shanghai Port,Nanjing Port,Tianjin Port.
Our Service
1,For all your inquires about us or our products,we will reply you in details within 24 hours.
2,We own professional sales&after-sales services who can speak fluent English language.
3,Tail-made Welcome to submit your idea, we can turn your idea to products.
4,Discounts are offered based on order quantities.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884