|
Product Details:
Payment & Shipping Terms:
|
Material: | Iron | Feature: | Fast Erection |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Product Name: | Fast Erection Span 17-51m Emergency Equipment Mechanized Bridge |
Condition: | New Bridge | Warranty: | 1 Year |
Application: | Emergency Equipment | Span: | 17、25.5、34、42.5、51m |
Standard: | AISI ASTM GB BS GB/BS | Color: | Clients' Requirments |
High Light: | mechanized rescue bridge,iron rescue bridge,mechanized bridge large single span |
Ambient Temperature -41℃~+50℃ Large Single Span Mechanized Bridge
Description of Ambient Temperature -41℃~+50℃ Large Single Span Mechanized Bridge :
Ambient Temperature -41℃~+50℃ Large Single Span Mechanized Bridge is a set of mechanized bridge with long single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.
Technical data of Ambient Temperature -41℃~+50℃ Large Single Span Mechanized Bridge:
Curb weight of erection vehicle (including 3 men): 33t
Curb weight of transportation vehicle: 21t
Dimensions of erection vehicle (length×width×height):13600mm×3200mm×3470mm
Dimensions of transportation vehicle (length×width×height):12000mm×3400mm×3500mm
Design loading: tracked loading 60t
Wheeled (load on axle) 13t
Max. tracked loading: ≤ 15km/h
Max. wheeled loading: ≤ 30km/h
Design using longevity (loading across) 10000 times
Erection length : 17m,25.5m,34 m,42.5 m,51 m
Erection width: 4m
Negotiating depth: ±3m
Erection maximum longitudinal gradient: 10 %
Erection maximum transverse gradient : 5%
Erection time (complete bridge) 90min
Retrieval time (complete bridge) 90min
Operator: 3~4 men (not including drivers of transportation vehicles)
Ambient temperature: -41℃~+50℃
Max. speed: 80km/h
Min. turning dia: 24m
Min. ground clearance: 300mm
Max. fording depth: 700mm
Max. gradeability: 60%
Max. continued mileage: 650km
Main features of Ambient Temperature -41℃~+50℃ Large Single Span Mechanized Bridge:
1Excellent cross country performance: Cross country chassis (8×8 erection vehicle, 6×6 transportation vehicle)
2 Large single span: max. single span reaches 51m
3 Less composition unit: one erection vehicle, six transportation vehicle
4 Fast erection: 90min (To erect a 51m bridge)
5 High mechanization level, low labor intensity: using remote control operation
6 Less operators: 3-4(not including drivers)
Ambient Temperature -41℃~+50℃ Large Single Span Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.
FAQ
1,How about quality control of your company?
Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.
2,Are you a factory or a trade company?
We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.
3,Where is your loading port?
Shanghai Port,Nanjing Port,Tianjin Port.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884