|
Product Details:
Payment & Shipping Terms:
|
Material: | Iron Bridge | Feature: | Large Span |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Status: | Sefl Fold And Unfold |
Product Name: | Tracked Load LD-60 Emergency Bridge Mechanized Bridge | Condition: | New |
Warranty: | 2 Year | Application: | Emergency Equipment |
Span: | 17-51m | ||
High Light: | high mechanization level temporary bridge,51m temporary bridge,high level mechanized bridge |
High Mechanization Level 51m Mechanized Bridge
Description of High Mechanization Level 51m Mechanized Bridge :
High Mechanization Level 51m Mechanized Bridge is a set of temporary large span bridge equipment carried by erection vehicle, accomplishing the erection and retrieval operation by the erection vehicle,which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.
High Mechanization Level 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
High Mechanization Level 51m Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.
Main data of High Mechanization Level 51m Mechanized Bridge:
No | Item | Data |
1 | Curb weight of erection vehicle | 33t |
2 | Curb weight of transportation vehicle | 21t |
3 | Load capacity | |
Tracked load | 60T | |
Wheeled load | 13T | |
4 | Life time | 10000 times |
5 | Erection length | 17m,25.5m,34m,42.5m,51m |
6 | Erection width | 4m |
7 | Negotiating depth: | ±3m |
8 | Erection maximum longitudinal gradient | 10% |
9 | Erection maximum transverse gradient | 5% |
10 | Erection time (complete bridge) | 90min |
11 | Retrieval time (complete bridge) | 90min |
12 | Operator(not including driver) | 3~4 |
13 | Ambient temperature | -41℃~+50℃ |
High Mechanization Level 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
Harzone Industry was built in 1967, one of the subsidiary units of China State Shipbuilding Corporation Limited(CSSC), a state-owned and protected military company. Over the past four decades, the leaders of both the Party and nation have been caring for the growth of the company. Chairman Mao underlined the documents for the factory establishment. Later, ZhangAiping., one General, and Chen Shiju, one commander, inscribed name for the company. In 2008, Mr. He Guoqiang, Standing Committee of Political Bureau of CPC Central Committee, Secrrtary of the Discipline Inspection Commission of CPC Central Committee had paid a visit to the company and inspected the workshop and saw the erection of the mechanized bridge, who also encouraged the company to develope well.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884