|
Product Details:
Payment & Shipping Terms:
|
Material: | Steel | Feature: | Large Span |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Status: | Sefl Fold And Unfold |
Product Name: | Tracked Load LD-60 Emergency Bridge Mechanized Bridge | Condition: | New |
Application: | Emergency Bridges | ||
High Light: | large span mechanized bridge,fast erection mechanized bridge,51m fast bridges |
Fast Erection 90min 51m Mechanized Bridge
Description of Dimension Of Fast Erection 90min 51m Mechanized Bridge :
Fast Erection 90min 51m Mechanized Bridge is a set of temporary large span bridge equipment carried by erection vehicle, accomplishing the erection and retrieval operation by the erection vehicle,which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.
Fast Erection 90min 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
Main features of Dimension Of Erection Vehicle (L×W×H ) 13.6m×3.2m×3.47m Mechanized Bridge:
1Excellent cross country performance: Cross country chassis (8×8 erection vehicle, 6×6 transportation vehicle)
2 Large single span: max. single span reaches 51m
3 Less composition unit: one erection vehicle, six transportation vehicle
4 Fast erection: 90min (To erect a 51m bridge)
5 High mechanization level, low labor intensity: using remote control operation
6 Less operators: 3-4(not including drivers)
No | Item | Data |
1 | Curb weight of erection vehicle | 33t |
2 | Curb weight of transportation vehicle | 21t |
3 | Dimension of erection vehicle (L×W×H ) | 13.6m×3.2m×3.47m |
4 | Dimension of transportation vehicle (L×W×H ) | 12m×3.4m×3.5m |
5 | Load capacity | |
Tracked load | 60T | |
Wheeled load | 13T | |
6 | Life time | 10000 times |
7 | Erection length | 17m,25.5m,34m,42.5m,51m |
8 | Erection width | 4m |
9 | Negotiating depth: | ±3m |
10 | Erection maximum longitudinal gradient | 10% |
11 | Erection maximum transverse gradient | 5% |
12 | Erection time (complete bridge) | 90min |
13 | Retrieval time (complete bridge) | 90min |
14 | Operator(not including driver) | 3~4 |
15 | Ambient temperature | -41℃~+50℃ |
Fast Erection 90min 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
This is China Harzone Industry Corp.,Ltd., our company was founded in 1967,and we are a member of China State Shipbuilding Corpration Limited(CSSC),which is the largest central state-owned shipbuilding and military enterprise in China. As the pioneer in the research and manufacturing of emergency and rescue equipment in China, Harzone is the first company from the emergency industry listed in the stock exchange.
China Harzone dedicates itself to the following fields:
Design and manufacturing of military bridges and emergency rescue equipment
Design,manufacturing and installation of various kinds of steel bridges and steel structures
Research and re-fitting of special-purpose vehicles and equipment
Engineering contracting
Import and Export trading business
Harzone products have been exported to more than 40 countries and regions around the world and own a good reputation from international client.Moreover,China Harzone has been listed in the state emergency purchasing system and also the largest qualified rescue machinery supplier of the United Nations Emergency Procurement.
Please feel free to contact with us if you have any question.
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884