Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
CHINA HARZONE INDUSTRY CORP.,LTD.
Home ProductsMechanized Bridge

Sefl Fold And Unfold 21 Meters Army Temporary Bridge Emergency Bridge

China CHINA HARZONE INDUSTRY CORP.,LTD. certification
China CHINA HARZONE INDUSTRY CORP.,LTD. certification
A good company, a trusted friend.

—— DAMS IMPLEMENTATION UNIT, (DIU

A company who is specialized in fabricating the Delta Bridge and Bailey Bridge.

—— Durga Enterprise

We have done several cooperations together and ejoyed good relationship.

—— Jade Mountain Gems Co., Ltd

A good company for cooperation.

—— Salas Luis

I'm Online Chat Now

Sefl Fold And Unfold 21 Meters Army Temporary Bridge Emergency Bridge

Sefl Fold And Unfold 21 Meters Army Temporary Bridge Emergency Bridge
Sefl Fold And Unfold 21 Meters Army Temporary Bridge Emergency Bridge

Large Image :  Sefl Fold And Unfold 21 Meters Army Temporary Bridge Emergency Bridge

Product Details:
Place of Origin: China
Brand Name: Harzone
Payment & Shipping Terms:
Minimum Order Quantity: negotiation
Packaging Details: According to detailed order
Delivery Time: negotiation
Payment Terms: According to detailed order
Detailed Product Description
Product Name: Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge Material: Metal
Feature: Fast Erection Status: Sefl Fold And Unfold
High Loading Capacity: 60t Usage: Overcoming Dry Gaps
Condition: New Equipment
High Light:

21 Meters Army Temporary Bridge

,

Sefl Fold Army Temporary Bridge

,

Unfold Emergency Bridge

Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge

Introduction of Mechanized Bridge

Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge is a set of mechanized bridge equipment carried by vehicle, accomplishing bridge erection and retrieval by itself.

 

Main Features of Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge

 

1 Fast erection: 10min

2 Less operators: 2-3

3 Excellent cross country performance: using 8×8 militarycross country chassis

4 High level of mechanization & low labor intensity: using remote control operation

5 High loading capacity: Tracked load-60t, wheeled load-13t

 

Basic composition of Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge

 

The span is folded on the chassis when transportation and erected by chassis. The auxiliary equipment is used to help with erecting and fixing.It is mainly composed of chassis,span and auxiliary equipment.

 

Usage of Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge

 

Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge  is main used as 21m long, 3.3m wide short-lived stations for overcoming small medium rivers, dry gaps and craters, guarantee all kinds of vehicles with a tracked load of up to 60 tons or an axle load of up to 13 tons to go across quickly.

 

 

Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge Picture

Sefl Fold And Unfold 21 Meters Army Temporary Bridge Emergency Bridge 0

 

Contact Details
CHINA HARZONE INDUSTRY CORP.,LTD.

Contact Person: Ms. Sun Ruyu

Tel: 0086-13871570243

Fax: 86-10-88395884

Send your inquiry directly to us (0 / 3000)