Product Details:
Payment & Shipping Terms:
|
Material: | Steel\iron Bridge | Capacity: | Tracked Load 60t |
---|---|---|---|
Structure: | Simple Structure | Name: | Military Bridge |
Bridge Length: | 21-24M | Product Name: | Erection Time 10min Max. Speed 85km/H Military Mobile Bridge |
Certification: | ISO | Type: | Heavy |
Color: | Clients' Requirments | ||
High Light: | 10min Military Mobile Bridge,85km/H Military Mobile Bridge,85km/H army mobile bridge |
Erection Time 10min Max. Speed 85km/H Military Mobile Bridge
1. Introduction of Erection Time 10min Max. Speed 85km/H Military Mobile Bridge
A set of Erection Time 10min Max. Speed 85km/H Military Mobile Bridge carried by vehicle, accomplishing bridge erection and retrieval by itself.
2. Usage of Erection Time 10min Max. Speed 85km/H Military Mobile Bridge
Erection Time 10min Max. Speed 85km/H Military Mobile Bridge main used as 3.3m wide,24m or 21m long temporary channels for overcoming small river, dry gap and craters, ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 13 tons to go across.
3. Basic composition of Erection Time 10min Max. Speed 85km/H Military Mobile Bridge
Erection Time 10min Max. Speed 85km/H Military Mobile Bridge is mainly composed of auxiliary, span and chassis equipment. The brdige is folded on the chassis when transportation and erected by chassis. The auxiliary equipment is used to help with erecting and fixing.
4. Main Features of Erection Time 10min Max. Speed 85km/H Military Mobile Bridge
No | Item | Data |
1 | Total weight | ≤32t |
2 | Outline dimension (L×W×H) | 13m×3.32m×3.6m |
3 | Load capacity | |
Tracked Load | 60t | |
Wheeled Load | 17t | |
4 | Span weight | 10.5t |
5 | Bridge length | 21m |
6 | Erection time | 10min |
7 | Retrieval time | 10min |
8 | Max. longitudinal slope | ±10% |
9 | Max. lateral slope | ±5% |
10 | Allowed bank differences | ±2.0m |
11 | Operators | 2~3 |
12 | Max. speed | 85 km/h |
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884