Product Details:
Payment & Shipping Terms:
|
Material: | Steel Bridge | Feature: | Reusable |
---|---|---|---|
Capacity: | Heavy Loading Capacity | Structure: | Simple |
Status: | Sefl Fold And Unfold | ||
High Light: | Wheel Type Striking Bridge,Wheel Bridge |
Automatic Single Span Deck Heavy Mechanized Bridge For Temporary Transportation
Description:
Heavy Mechanized Bridge is a set of equipment mainly used for bridging small and medium rivers, dry gaps and marshland with a length within 75m and a depth within 5.5m to ensure all sorts of tanks, artilleries and vehicles, and personnel to get across.
The complete set consists of five transport vehicles with bridge spans with a length of 15m. The chassis is type XC2300/8×8 15T class cross-country truck, with advanced engine, gearbox and axles etc. The trestles are controlled by hydraulic winch; the outriggers ban be adjusted by automatic control technology, with double class hydraulic cylinders. The bridge is erected with shear style erection, and span stretching at mean time to keep safety and stability in erection.
Specification: |
|
Total weight |
30.6t |
Folded outline dimension (L*W*H) |
10890*3150*3660 mm |
Tracked load |
60t |
Axle load |
13t |
Roadway width |
3.8m |
Span length |
15m |
Max. bridge length |
75m |
Max. height (from shoes to deck) |
5.5m |
Erection time for a single span |
12 min |
Max. current velocity |
2m/s |
Operator |
7 operators for a single span |
Contact Person: Ms. Sun Ruyu
Tel: 0086-13871570243
Fax: 86-10-88395884